USD 501 - Topeka High School Gymnasium
LSA provided the MEP design for the new gymnasium for Topeka High School. This new building contains the gymnasium, locker rooms and lobby.
Systems specific to this project include: modulating gas-fired units designed to serve the gymnasium with future room for DX coil, an energy recovery unit was designed for the locker rooms, an air handling unit with DX coil and two-stage gas fired duct heater was designed for the main lobby area, two water heaters with recirculating hot water lines were designed to serve the locker rooms, 600 Amp main distribution panel was designed to serve the entire building, and all the units are controlled through automated logic DDC system located in the main high school building.
